[1]
Agurto Lorren, L.I. 2021. PLAN DE IMPORTACION DE CALDERA DE VAPOR PARA MEJORAR EL PROCESO PRODUCTIVO DE POSTES DE CONCRETO EN TPCH: STEAM BOILER IMPORT PLAN TO IMPROVE THE PRODUCTION PROCESS OF CONCRETE POSTS IN TPCH. HORIZONTE EMPRESARIAL. 8, 2 (dic. 2021), 564–575. DOI:https://doi.org/10.26495/rce.v8i2.2010.